Beijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd.'s U.S. PCT international patent, A Precision Lifting Method and Lifting Reinforcement Structure for Factory Equipment Foundations (Application No. PCT/CN2020/107608), introduces an innovative three-step construction method: “curtain wall isolation + inverted-U-shaped reinforcement body underpinning + retreating segmented precision lifting.” Designed to address the problem of differential settlement in precision factory equipment foundations, this method achieves low-disturbance, millimeter-level, high-precision controlled restoration while ensuring that production lines can continue operating normally throughout the construction process.

I. Problem Introduction: Settlement of Thin Floor Slabs in Precision Manufacturing Facilities

Precision processing equipment is extremely sensitive to foundation deformation. Floor settlement directly reduces machining accuracy and can result in large quantities of defective products. In many factory buildings with frame structures, dedicated equipment foundations are not constructed separately. Instead, equipment is placed directly on ordinary concrete floors. When weak backfill soil layers or insufficient foundation bearing capacity exist beneath the floor, voids can form between the floor and the soil, leading to differential settlement.

3d8221e72ea7df73efce070ef972645d

Precision factory equipment is densely arranged, making conventional reinforcement construction highly likely to disturb surrounding equipment. Conventional pressure grouting processes also involve uncontrollable pressure, which can cause localized floor bulging and seriously affect the operation of precision equipment.

The core problem addressed by this patent is how to reinforce the backfill soil beneath the floor and accurately lift the settled equipment foundation back to its designed elevation, without affecting the normal operation of the equipment or disturbing surrounding machinery.

II. Core Technical Solution of the Patent: A Three-Step Method—Enclose, Reinforce, and Lift

Hengxiang Hongye's U.S. PCT international patent, A Precision Lifting Method and Lifting Reinforcement Structure for Factory Equipment Foundations (Application No. PCT/CN2020/107608), proposes a construction process of “enclose first, reinforce second, and lift last.”

First, two parallel curtain walls are constructed by vertically drilling holes and pouring material in the area to be repaired, isolating the construction area from the surrounding soil. Next, inclined grouting holes are arranged along the curtain walls, and special composite materials are injected beneath the floor. After solidification, these materials form an inverted-U-shaped underpinning reinforcement body with a steel reinforcement framework, which constrains the floor and prevents localized bulging. Finally, lifting holes are arranged beneath the reinforcement body, and retreating segmented grouting is carried out. The controlled upward force generated by the grouting material lifts the foundation, while real-time visualized intelligent monitoring is used to regulate the entire process.

674a700e7126fef8d75ce30a9f8914b0

The entire process confines the grouting area and lifting force within the construction cavity. This prevents disturbance to surrounding precision equipment while enabling uniform load-bearing and stable overall lifting. Ultimately, millimeter-level accuracy in elevation restoration can be achieved without shutting down the factory.

Vertical holes are drilled downward on both sides of the area where the equipment needs to be lifted to construct two parallel curtain walls, isolating the construction impact zone from the surrounding soil. Inclined downward grouting holes are then arranged along the curtain walls. Special composite materials are injected beneath the floor slab and between the two curtain walls. After solidification, an inverted-U-shaped reinforcement body is formed, with an internal steel reinforcement framework to prevent the floor slab from bulging. Lifting holes are drilled beneath the reinforcement body, and retreating segmented grouting is performed to use the upward buoyant force to lift the equipment as a whole to the specified elevation. This achieves reinforcement and lifting with millimeter-level precision.

III. Core Advantages of the Patent

1. Curtain Wall Isolation, Zero Disturbance to Adjacent Machinery

The two curtain walls completely isolate the construction area from the surrounding soil. Grouting pressure and grout diffusion are confined within the cavity, preventing impacts on the floor slabs beneath adjacent equipment.

2. Inverted-U-Shaped Integrated Underpinning, Preventing Floor Bulging

The inverted-U-shaped reinforcement body encloses the floor slab and combines with the curtain walls to form an integrated load-bearing structure. This prevents localized areas from bulging first and enables stable, uniform overall lifting.

3. Retreating Segmented Process, High Lifting Precision

The retreating segmented process ensures that the lifting force is uniform and controllable, achieving millimeter-level precision and meeting the stringent elevation requirements of precision equipment.

IV. Application Scenario: Differential Settlement Treatment at a Lithium-Containing Winding Factory of CATL in Ningde, Fujian

The lithium-containing winding factory of CATL in Ningde, Fujian, has a reinforced concrete frame structure, a building height of 14.7 meters, and a total treatment area of 15,000 m². The shallow soil layer at the site consists of high-porosity backfill soil, while the deeper layer consists of highly compressible silt. These two weak soil layers resulted in a maximum floor settlement of 150 mm, directly interfering with the production of precision winding equipment.

The project combined the patented process with non-destructive, controllable soil solidification technology. First, curtain walls were installed to divide the area into independent construction zones. Special composite materials were then injected to form an inverted-U-shaped underpinning reinforcement body, which was closely integrated with the existing pipe pile foundation. Finally, the floor was lifted through retreating segmented grouting, with an intelligent monitoring system providing support throughout the process to achieve millimeter-level precision lifting.

1fb0d521c3536fac388a70f655e747e2

The entire factory maintained normal production throughout the construction period, with no shutdown or production suspension. After completion, the floor was accurately restored to its designed elevation. The project passed acceptance inspection in a single attempt, and no secondary settlement has occurred since it was put into operation.

Customer feedback:

“The construction process did not delay production at any point. After the floor was restored, the machining accuracy of our precision equipment completely returned to its standard condition.”

V. Corporate Innovation and International Intellectual Property Strength

Hengxiang Hongye, the holder of this patent, has received a professional certification from the Ministry of Science and Technology for its core technology in high-rise building lifting and rectification, recognizing it as “internationally advanced overall, with certain aspects reaching an internationally leading level” (Certificate No. 202311ZK7875).

The company is an industry-university-research cooperation partner of China University of Geosciences (Beijing) and China University of Mining and Technology (Beijing). It has formulated one corporate standard and has submitted or obtained a total of 148 domestic and international patent applications and granted patents, including 32 international patents. It has also published 14 academic papers, 9 of which are indexed by SCI.

Bb061e2babf4d778da01a7ba93da51e3

The company has completed more than 1,000 floor and foundation settlement reinforcement, lifting, and leveling projects. It has established in-depth partnerships with international companies such as Mercedes-Benz, 3M, and Nestlé, as well as leading domestic enterprises including CATL, Geely, and Haier. Its overseas business covers multiple countries, enabling it to provide solutions for foundation settlement problems worldwide.

VI. Conclusion and Outlook

Through its integrated process of curtain wall isolation, inverted-U-shaped underpinning, and segmented precision lifting, this international patent provides a comprehensive settlement treatment solution tailored to precision manufacturing facilities. It addresses key industry challenges, including disturbance to adjacent machinery, floor bulging, insufficient precision, and production losses caused by shutdowns.

In the future, Hengxiang Hongye will continue integrating intelligent monitoring and digital technologies to advance precision lifting technology for factory equipment foundations and provide efficient, non-destructive foundation reinforcement solutions for precision industrial facilities worldwide.

en.hengxianghongye.com